Category: | Cycleway: Other (infrastructure-related) |
Tags: | droppedkerb, giveway, path, station |
Date time: | 9.19am, Wednesday 26th August, 2015 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Barnard Castle |
A cycle path (most of the way) to the station. Other end at #71071.
Comments reflect the views of the original submitter only.
* Items marked with an asterisk [*] are required fields and must be fully completed.
A project originating from Cambridge Cycling Campaign // Hosting kindly helped by Mythic Beasts
Short link: https://cycle.st/p71072